Bran Sands - Train C

On behalf of Sulzer, Aermech successfully completed the blower and pipework installation on Northumbrians Waste Water Treatment works at Bran Sands, Train C.

Our manufacture and installation scope of works consisted of a new DN1100 Stainless steel airman, interconnection 7 HST30 containerised blowers with a 30meter long manifold, spanning an access road at high level and connecting into an existing ASP valve, around 12meters above ground level along with a range of bespoke structural galvanised supports.